What is the lead time on a datablok build?
Typically 12-16 weeks from date of design acceptance and receipt of order.
Typically 12-16 weeks from date of design acceptance and receipt of order.
The datablok can accommodate up to 12x 42RU ICT racks in a single datablok, with unlimited modular scaleability available to build a solution in excess of this module limit.
Tier Level 1 through to Tier Level 4 are available.
Requirements up to 40kW fault-tolerant can be accommodated in a single datablok, with unlimited scaleability available to build a solution in excess of this module limit.
The life expectancy of a proactively maintained datablok is 30+ years.
Cost varies depending on final design and configuration, however compared to establishing an ICT environment in a building the datablok is a significantly more cost-effective option.
The datablok can be built and certified to any seismic standard required.
We offer a wide range of both remote and on-site maintenance services to ensure the datablok asset value is preserved and that the datablok continues to perform at the service levels required.